Saturday, November 21st, 2026 logo中文
工业工程

Industrial Engineering Journal

This journal has been selected for: 北大核心2020、RCCSE、CSTPCD、JST、AJ

:Industrial Engineering Journal

  • :Department of Education of Guangdong Province
  • :Guangdong University of Technology
  • :1998
  • :Bimonthly
  • ISSN: 1007-7375
  • :CN 44-1429/TH
  • :
  • :
该翻译结果由 aliyunbailian.svg 提供平台支持,由DeepSeek 模型实际翻译

Issue 4 ,   2026

Opening Words (F0002-F0002)

Dynamic Scheduling of Final Assembly Logistics for Complex Products Based on DT-DQN [Liu Huwei[1], Liang Kaibo[2], Yang Jianglong[3], Zhao Junhui[4]] (1-17)

An AI-driven Predictive Maintenance and Health Management System for Rapidly Deployable Oil Pipelines [Zhang Yang[1], Li Jiang[1], Yang Qi[1], Hu Beiping[2], Deng Anli[2]] (18-26)

An Explainable Deep Learning Approach for Cycle Time Prediction in Wafer Fabrication [Ding Long[1], Fu Wenhan[1,2], He Yuchun[1], Zuo Chunyi[1]] (27-34)

Operational Mode Selection of Battery Swapping Supply Chains for New Energy Vehicles Based on Battery Leasing and Swapping Services [Xie Mingyu[1], Huang Tingting[1], Zhang Chengtang[2]] (35-45)

A Distributed Configuration Optimization Method for Low-Carbon Agri-Food Supply Chains Based on Responsibility Tokens and FedADMM [Mo Minzhi[1], Nie Duxian[1]] (46-61)

Subsidy Strategy Analysis for Rural Logistics with Freight Bus Services [Zhang Zhisen[1], Wang Haiyan[1]] (62-71)

Research on Dynamic Operation Strategy of Live E-commerce Considering Online Viewers and Reference Price [Li Peiqin[1], Lin Zhouzhan[1]] (72-85)

Dual-Pattern Diagnosability of Discrete Event Systems under Dynamic Observation [Xiao Cuntao[1], Liu Fuchun[1]] (86-95)

A Highway Vehicle Lane-Changing Decision Optimization Framework Based on Two-stage GAIL-PPO Training [Guo Hongjiang[1], Zhu Zhengze[1], Gong Jiayuan[1], Yin Zheng[2], Lyu Chengzhi[1]] (96-105)

Optimization of Vehicle Scheduling for Fresh Agricultural Products to be Processed Considering Time-Varying Traffic [Zheng Jiapeng[1], Zhang Lijie[2], Xiong Zonghui[1]] (106-116)

Robust Project Scheduling Optimization for Extra-long Railway Tunnel Engineering Considering Resource Transfer [Zhou Guohua[1], Jin Ran[1], Zhou Fangting[2], Xie Yalong[3,4]] (117-129)

Multi-project Scheduling for Aircraft Strength Testing under Multi-resource Constraints [Zhang Han[1,2], Wang Chuangjian[1,2]] (130-140)

Dynamic Multi-row Facility Layout Optimization Based on IPSO [Xu Bin[1,2,3], Chen Kang[1], Han Yue[1]] (141-150)

Efficiency Analysis and Optimization of Layer-Switching Strategies for Automated Vehicle Storage and Retrieval Systems [Luo Lei[1,2], Wang Yong[3], Zhao Ning[2], Jia Nan[3], Huang Zhuang[3]] (151-164)

Overcoming the Implementation Bottleneck in Intelligent Manufacturing: A Lean-Based Production Process Design Method with Case Studies [Lin Yu[1], Wei Ziyu[1], Li Zheng[1]] (165-176)